Fly through a 3D model of the future Oakridge development

source: vancouverisawesome.com

The massive $5 billion Oakridge Centre overhaul won’t be ready until 2028, but you can see what it will be like to walk through the main pedestrian walkway already.

A fly-through video has been uploaded by the project’s architects to show one section, dubbed DP3 (there are six sections). It’s the project’s main mall entry and transit plaza; in other words, it’s a major public-facing section.

Read full article here.